Skip to main content

Fiber contractor guidelines

    Boxes should be located near floor or with long enough winder boxes to enable work on the floor
      No ladders should be necessary for maintenance / splicing.
      Cable should not be jammed in distribution boxes. All cables/ports should be labeled. All work should be centrally documented (Mesh or contractors). All connections in a cable should be terminated initially.   Never leave cables unterminated.