Fiber contractor guidelines
- Boxes should be located near floor or with long enough winder boxes to enable work on the floor.
- No ladders should be necessary for
maintenance /maintenance/splicing.
- No ladders should be necessary for
- Cable should not be jammed in distribution boxes.
- All cables/ports should be labeled.
- All work should be centrally documented (Mesh or contractors).
- All connections in a cable should be terminated initially. Never leave cables unterminated.