Post Install Checklist (Appendix Page)
Post Install Checklist:
Configuration Checks:
- Omni password is set
- Firmware is correct version
- Update RouterBoard firmware if not already done
- All ports are labeled
- Bridge filters are enabled
- Static DHCP leases set where needed
Payment Checks:
- Member has paid
UISP:
- Add Omni to UISP
- Add LiteBeam to UISP (if installed)
- Add SXT to UISP (if installed)
- Add Netpower to UISP (if installed)
MeshDB:
- Confirm network number is assigned to the install
- Check that node is set as "active" and details are correct
- Check that install is set as "active" and details are correct
- Check "install date" is set
- Set "Is DIY"
- Manually trigger node import from UISP
- Check devices import correctly
- Check links import correctly and appear on map
OsTicket:
- Close OSTicket ticket with reason "installed"
Misc:
- Call support bot in #support-bot-reports to capture printout of physical connections to omni
(Thread for reasoning -slack link)- Manually capture screenshots of NetPower port labels and post on slack somewhere
No comments to display
No comments to display