Skip to main content

Post Install Checklist (Appendix Page)

Post Install Checklist:

Configuration Checks:
  • Omni password is set
  • Firmware is correct version
    • Update RouterBoard firmware if not already done
  • All ports are labeled
  • Bridge filters are enabled
  • Static DHCP leases set where needed
Payment Checks:
  • Member has paid
UISP:
  • Add Omni to UISP
  • Add LiteBeam to UISP (if installed)
  • Add SXT to UISP (if installed)
  • Add Netpower to UISP (if installed)
MeshDB:
  • Confirm network number is assigned to the install
  • Check that node is set as "active" and details are correct
  • Check that install is set as "active" and details are correct
    • Check "install date" is set
    • Set "Is DIY"
  • Manually trigger node import from UISP
    • Check devices import correctly
    • Check links import correctly and appear on map
OsTicket:
  • Close OSTicket ticket with reason "installed"
Misc:
  • Call support bot in #support-bot-reports to capture printout of physical connections to omni
    (Thread for reasoning -slack link)
    • Manually capture screenshots of NetPower port labels and post on slack somewhere